Electrical systems, control and measurements systems and automation

Investor:
ECO Żagań
The task:
Remodeling of the automation systems and electric installations of the boiler
plant\'s hydraulic system.
Year: 2007
Investor:
The Ostrowski Heating Company
The task:
Installation of automatic control engineering of heat generation power unit with
the ORC turbine set and biomass fired boiler
Year: 2007
Investor:
Aquanet Krzesinki
The task:
Installation the automatic control of the power systems of the water supply
station in Głęboczek
Year: 2006
Investor:
Dalkia Poznań – the Electroheating Conglomerate in Poznań
The task:
Installation of the heating energy measuring systems at EC Karolin and EC
Garbary in Poznań
Year: 2005
Investor:
The Municipal Heating Energy in Koszalin
The task:
Installation of the technological sewage measuring systems at the company\'s
premises
Year: 2005
< 1 | 2 >